top of page

WORK EXPERIENCE

Experience: Experience
suffolk-construction-logo-png_seeklogo-616616_edited.png

July 2022 - August 2022

Assistant Project Manager, Suffolk Construction

​350 Summer Street

​

  • Led weekly MEP coordination meetings with 5+ subcontractors using BIM 360 and Navisworks to identify and resolve 100+ spatial conflicts across 16 floors between HVAC ductwork, mechanical and plumbing risers, electrical and telecommunications conduits, and structural elements to reduce field rework, and maintain project schedule while preserving ceiling heights and code-required clearances.

​

  • Reviewed shop drawings in Bluebeam to verify equipment specifications and code compliance, and managed 100+ MEP submittals and 50+ RFIs in Procore.

suffolk-construction-logo-png_seeklogo-616616_edited.png

September 2020 - present

Project Engineer, Suffolk Construction

South Station​

  • Developed MEP logistics and sequencing plan for temporary ventilation installation above active South Station commuter rail tracks to secure MassDOT approval and implemented safety protocols enabling installation of overhead steel with zero service interruptions or safety incidents.

​

400 Summer Street 

  • Supported Assistant Project Manager on $236M mixed-use project by processing change order requests across multiple trades.

download.png

June 2019 - August 2019

Mechanical Engineer Intern, Bose Corporation

  • Designed custom test fixture prototypes for Bose QuietComfort 35 II headphones in NX to simulate user button-press motion and force to replicate field failures and accelerate root cause analysis for quality.

improvement initiatives.

  • Performed a Gage R&R test on a product to analyze potential use of an alternative sealant.​​

​

  • Created drawing mark-ups using Geometric, Dimension &Tolerance (GD&T) in accordance with BOSE Operating Procedures to outsource an alternative vendor for specific product fasteners.

©2026 by Amani Campbell

bottom of page